Work Packages
Currently available work packages:
WP03 Specifications of demonstrators for improved strategic and tactical planning of the rail network
The objectives of this work package are to align, prepare and deliver the high-level (Workstream 1.1) specifications of requirements, high- level design and high-level use cases for development of the Technical Enablers 1 to 7.
WP06 Development - Decision support for planning and timetable optimisation
The objective of this WP is to improve long-term and short-term timetabling of the railway network. The activities aim at increasing infrastructure and transport utilisation capacity through optimised and robust timetables, synchronized with rolling stock planning, among others. In WP6, advanced algorithms are developed for the generation and adjustment of timetables and rolling stock planning.
WP07 Demonstration - Decision support for planning and timetable optimisation
The objective of this WP is to further develop and demonstrate the algorithms developed in WP6, also by the creation of a testbed and a benchmark methodology for conducting rigorous, transparent, and replicable testing for comparing both the algorithms and the plans/timetables generated by them. Finalisation of development and demonstrations for Technical Enablers 3, 4 and 6 will be performed at target TRL 5/6 using decision support systems on short-term planning, algorithms for long-term timetabling, integrated network and station planning as well as rolling stock planning.
Public Deliverables
Currently available deliverables:
D3.1 Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 4-9
D3.1 Mapping against scope_ specification of technical enablers_ high-level use cases_ high-level requirements_ high level design for demonstrators in WPs 4-9 - 16/02/2024
This document constitutes the Deliverable D3.1 “Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high-level design for demonstrators in WPs 4-9” in the framework of the Flagship Project FP1-MOTIONAL.
The objective of this deliverable is to align, prepare and deliver the high-level specifications of requirements, high-level design, and high-level use cases for the development of the technical enablers 1 to 7. The high-level specification is done in parallel with more detailed specifications from WP4, WP6 and WP8. Participants from all WPs contributed to the texts.
In the project proposal, seven technical enablers were linked to Workstream 1.1 (Planning work packages), i.e., WP4/WP5 (Integration of Planning Systems and Processes), WP6/WP7 (Decision Support and Optimization) and WP8/WP9 (Simulation and Operational feedback). Here, each of the technical enablers are described in detail, including alignment with previous results, current state of practice, assigned development needs and high-level requirements.
An extensive mapping is also a result that is presented in this deliverable. All demonstrators (that further on will be called demonstrations) in Workstream 1.1 are introduced and described, together with related use cases. There are 13 demonstrations and they are all mapped against technical enablers, TRL levels, use cases and the high-level requirements defined for each technical enabler. They are also mapped against simulation environments and frameworks to be used within WP4/WP5, WP6/WP7 and WP8/WP9. Finally, the alignment and interactions between WP4-WP9 demonstrations and other FA1 WPs, other Flagship Projects and SP Task 3 CMS/TMS and RNE are mapped.
D6.1 Report on the description of algorithms for long-term timetabling, short-term timetabling and rolling stock planning
D7.1 Report of the demonstrators of algorithms for long-term timetabling, short-term timetabling and rolling stock planning