TE10 Enabler 10


Integration of TMS with a) yard management system and processes; b) station management system and processes; c) energy management (Electric Traction System); d) real-time crew / rolling stock dispatching [TRL6/7]

Project: - FP1 - MOTIONAL (01/12/2022 - 30/09/2026)

logo

Work Packages

Currently available work packages:

WP10 Alignment of specifications

The objectives of this work package are to align, prepare and deliver the high-level specification of requirements, high-level design and high-level use cases based on a state-of-the-art analysis undertaken in conjunction with Technical Enablers 8 to 17

WP11 Development - Integration of TMSs and processes including cross-border traffic management

The overall objectives of WP11 are linked to Technical Enablers 8, 9 and 10 covering specification, and development of use-cases, processes and interfaces needed to achieve a much higher integration level of functions and decision processes including increase of the precision of the traffic prediction. In focus are also the alignment between different TMS areas including cross-border and integration of TMS with yard station and energy management systems as well as crew and rolling stock planning and management systems. The specification and development of appropriate interfaces between the different clients and stakeholders and applications will help to support an aligned re-planning and management of platform track/parking/facility track allocation of trains including graphical visualisation, conflict detection and resolution. The new possibilities will increase the interests and the level of engagement of RUs in traffic operation. All of the developments regarding Technical Enablers 8, 9 and 10 achieve TRL 4 in this WP.

Public Deliverables

Currently available deliverables:

D10.1 Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18
D11.1 Specification of selected Processes and Communication between applications
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.