Work Packages
Currently available work packages:
WP10 Alignment of specifications
The objectives of this work package are to align, prepare and deliver the high-level specification of requirements, high-level design and high-level use cases based on a state-of-the-art analysis undertaken in conjunction with Technical Enablers 8 to 17
WP16 Demonstration - Linking TMS to ATO/C-DAS for optimised operations
This work package aims to demonstrate seamless integration from TMS and ATO by testing them in an emulated “live” environment by human-in-the-loop demonstration and test bench. Here you can see train-drivers-traffic managers and signallers will interact, each in his own (emulated) workplace environment working and communicating together in a real traffic state; However, this demo will not include real-time interlocking. This WP is linked to Technical Enabler 12: Real-time convergence between planning & feedback loop from operations [TRL4/5] and Technical Enabler 15: TMS speed regulation of trains, precise routes and target times for ATO and dynamic timetables [TRL4/5].
Public Deliverables
Currently available deliverables:
D10.1 Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18
D16.1 Demonstrations by Human-in-the-loop simulator
D16.2 Demonstrations of TMS functionality for improved C-DAS operations