TE14 Enabler 14


Integration of incident management and customer information, with IM and RU interaction and Decision Support for Disruption management [TRL4/5]. Feedback-loop with traffic simulation (Technical Enabler 12) verifying the algorithms of Technical

Project: - FP1 - MOTIONAL (01/12/2022 - 30/09/2026)

logo

Work Packages

Currently available work packages:

WP10 Alignment of specifications

The objectives of this work package are to align, prepare and deliver the high-level specification of requirements, high-level design and high-level use cases based on a state-of-the-art analysis undertaken in conjunction with Technical Enablers 8 to 17

Public Deliverables

Currently available deliverables:

D10.1 Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.