Work Packages
Currently available work packages:
WP21 Demonstration: Integrate Rail with other transport modes
The results of the analysis of available data (WP19) and detailed description of technical developments (WP20) are used for this demonstration WP. Focus of this WP is to reach TRL 6-7 for Enabler 18 ( Improved rail integration using B2B intermodal services) and TRL 7-8 for Enabler 19 (Harmonised interfaces between rail operators and other transport modes). The objectives of this WP are to:
- Set the demonstrations (selection of demonstration place, definition of installation work and required data, requirements on enablers, user journey, monitor timelines, covering the testing strategy for all demonstrations planned for this WP)
- Execution of the demonstration (preparation, installation, dry-run, execution, collection of results
- Documentation and assessment of results and preparatory work for upcoming EU projects (according to MAWP) All objectives are aligned with the plans and strategies developed in WP2
Public Deliverables
Currently available deliverables:
D21.2 Integrate Rail with other transport modes - Analysis and assessment of Demonstration Results