Work Packages
Currently available work packages:
WP08 Hybrid battery/H2 vehicle demonstrators
In this WP we are going to implement the different developments of WP7 on demonstrators. Energy storage through H2 high-pressure tank will be implemented on infrastructure inspection vehicle. This vehicle is also link with FP3. Energy management solution to improve efficiency and range will be implemented on a hydrogen hybrid locomotive for freight-passengers and technical recommendation for sharing with WP9 for refuelling interfaces. These developments will contribute to energy and equivalent CO2 savings in the rail system and will be tested on track with the demos on FP4 together with FP3.
Public Deliverables
Currently available deliverables:
D8.3 Technical Recommendations for standardised H2 refuelling interface final report