Work Packages
Currently available work packages:
WP24 Preparation of demonstration and standardisation for seamless freight
The goal of WP24 is to prepare the activities for the demonstration efforts of WP 33 and WP 34. This is done via a continuous alignment of planning, timing execution and evaluation between all involved partners. Since this is a continuous and regularly updated process, the WP will run for the entirety of the first call. In addition, this WP also aims to provide input for standardisation, including a possible extension of the existing standards.
WP25 Seamless Use Case Definitions/Preparations, Functional and Basic Technical Specifications
To match the market requirements, the goal of this WP is to establish the functional and technical specifications of the necessary developments to achieve the vision of the seamless freight cluster of Destination 5. The actual development is done in WP 26-32, or in the respective work packages of the Destination 1 project, which is focussed on mainline network planning and management, as well as the FP3 project regarding the development of CBM.
WP27 Real-time and short-term Dynamic Dispatching Tools
Implement a harmonised real-time interface between Railway Traffic Management System and the yard/terminal management systems, to dynamically adapt planning and tasks in yards/terminals according to real-time evolution of traffic and availability of assets. Overall objective to enable harmonised yard/terminal operations across Europe to further ease interaction between different yards/terminals.
Public Deliverables
Currently available deliverables:
D24.1 Preparation of standardisation and demonstration
D25.1 Report on the basic functional and technical specifications for the realisation of the technical enablers of Seamless Freight
D25.2 Report on the basic functional and technical specifications for Seamless Planning, Dynamic Dispatching and Intermodal Prediction as relevant input for FP1
D25.3 Report on the basic functional and technical specifications regarding CMS as relevant input for FP3