TE11 Enabler 11


Specify and develop intermodal monitoring and prediction systems, which shall work in combination with dynamic TMS and other resource management systems using AI based models, accuracy and computational learning functions and cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi– annual Work programme in view of the evolutions of the solutions

Project: - FP5 - TRANS4M-R (01/07/2022 - 31/03/2026)

logo

Work Packages

Currently available work packages:

WP24 Preparation of demonstration and standardisation for seamless freight

The goal of WP24 is to prepare the activities for the demonstration efforts of WP 33 and WP 34. This is done via a continuous alignment of planning, timing execution and evaluation between all involved partners. Since this is a continuous and regularly updated process, the WP will run for the entirety of the first call. In addition, this WP also aims to provide input for standardisation, including a possible extension of the existing standards.

WP25 Seamless Use Case Definitions/Preparations, Functional and Basic Technical Specifications

To match the market requirements, the goal of this WP is to establish the functional and technical specifications of the necessary developments to achieve the vision of the seamless freight cluster of Destination 5. The actual development is done in WP 26-32, or in the respective work packages of the Destination 1 project, which is focussed on mainline network planning and management, as well as the FP3 project regarding the development of CBM. 

WP28 Rail-Centred Intermodal Monitoring and Prediction Systems

The goal of this WP is to develop key functions for intermodal monitoring and prediction systems which cover(s) the entire European intermodal transport chain by developing several rail-focused algorithm models as well as integrating other (prediction) systems for the first and last mile processes in a harmonised way. These intermodal prediction systems shall achieve a high and reliable performance in terms of pre-specified quality evaluation criteria. 

Public Deliverables

Currently available deliverables:

D24.1 Preparation of standardisation and demonstration
D25.1 Report on the basic functional and technical specifications for the realisation of the technical enablers of Seamless Freight
D25.2 Report on the basic functional and technical specifications for Seamless Planning, Dynamic Dispatching and Intermodal Prediction as relevant input for FP1
D25.3 Report on the basic functional and technical specifications regarding CMS as relevant input for FP3
D28.2 Intermodal process sensitivity/impact analysis
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.