TE14 Enabler 14


Testing, validation and certification (TRL5/6) – Testing, validation and (virtual) certification platforms and facilities focusing on continuous improvement of the testing process strongly influenced by specific deployments and tailoring of the safety procedures defined within the CENELEC environment. In addition, the migration towards a single European railway architecture defined for the CCS+ opens the opportunity to also streamline approval processes.

Project: - FP2 - R2DATO (01/12/2022 - 31/05/2026)

logo

Work Packages

Currently available work packages:

WP41 Remote Driving and Telecommand Demonstrator

Identification of use cases for the first demonstrator, development, implementation, and validation through a specific demonstrator in Oslo. The objective of this second work package is to implement a REMOTE DRIVING AND TELECOMMAND demonstrator up to TRL7.

WP42 Tramway autonomous movements in depot demonstrator

Identify use cases to be implemented in the second demonstrator, development, implementation, and validation through a specific demonstrator in Oslo. The objective of this third work package is to implement an AUTONOMOUS MOVEMENTS demonstrator up to TRL6.

WP43 Freight Demonstrator

To allow a smooth deployment of GoA 4 technology with different possible technological solutions, the systems need to be tested in real conditions in a demonstrator. The freight demonstrator will be equipped with sub-systems studied in the Technical Enablers. Tests will be performed, enhancing autonomous freight train operations.

Public Deliverables

Currently available deliverables:

D41.1 Collection of test cases and validation criteria (WP41)
D41.1 – Collection of test cases and validation criteria - 21/06/2024
Collection of test cases and validation criteria for remote driving of tramways demonstrator.
D41.2 Testing reports & assessment (WP41)
D42.1 Collection of test cases and validation criteria (WP42)
D42.2 Autonomous movements of trams in depot
D42.3 Testing reports & assessment (WP42)
D43.1 Testing plan
D43.7 Preparatory studies for FRMCS integration
All deliverables, results and publications herewith provided reflects only the author's view and the EURAIL is not responsible for any use that may be made of the information it contains.