Work Packages
Currently available work packages:
WP02 Regional Rail System Solutions/Architecture
Regional Rail System Solutions/Architecture
coordinates the work on system architecture of all WPs as well as ensuring exchange, alignment and harmonization with System Pillar and other FP projects. It will analyse the operational and functional system architecture for application on G1 lines to obtain the best and the lowest cost solution compatible with the ERTMS/ETCS specifications and for G2 lines (as interoperability is not strictly required) a simplified architecture .
This work package also focuses on the KPI assessment and on the migration strategies from the current CCS & Operation rules for the targeted regional solution.
WP06 Regional Rail Services Requirements & Specifications
This WP will define and develop specification for ahighly accurate multimodal travel solutions taking into consideration the work done in S2R Innovation Programme 4. It delivers service information for both on-board of regional vehicles and at regional rail stations, for passenger and freight. The work of WP6 will feed into WP11 where development and creation of final releases is done. The following topics will be covered in this WP:
i. multimodal travel solutions for first and last mile, passenger and freight;
ii. demand related capacity information by considering “new normal” travel behaviour;
iii. Integrate Traffic Management Systems and Passenger Information Systems in a smooth and reliable manner;
iv. Utilisation of regional lines for freight transportation to reach TRL 6.
WP07 Preparation for Regional Rail Integrated Demonstrators
The objective of this WP is to perform preparatory actions for
i. demonstrations of the feasibility of proposed technical solutions defined in the demonstration WPs and
ii. preparatory work for fully integrated demonstrators under operational conditions in the following projects for regional rail services up to TRL8 during the ER JU program period.
In addition, this WP will collect the preparatory works in digital environments to accomplish intermediate state demonstrators at component/subsystem or system level.
WP09 Regional Rail Assets Demonstrations
Based on the findings of WP4, this WP will carry out the demonstration activities (technical requirements, preparatory work for and results of the demonstrators, validation report) of the following technical enablers (TRL4/5):
i. Wayside assets
ii. Energy self-sufficient level crossings,
iii. Energy self-sufficient switches,
iv. Obstacle detectors and
v. Wayside objects connected via wireless technologies
WP11 Regional Rail Services Demonstrations
Based on the findings of WP6, this WP will carry out the demonstration activities (technical requirements, preparatory work for and results of the demonstrators, validation report) of the following technical enablers:
i. Multimodal travel solutions for first and last mile, considering ontologies defined in Shift2Rail IP4 for passenger and freight to reach TRL 6/7
ii. Integrate Traffic Management Systems and Passenger Information Systems to reach TRL 6
iii. Demand related capacity information to reach TRL 6/7
iv. Utilisation of regional lines for freight transportation to reach TRL 6
This WP will also continue the work (started in WP6) on analyse data bases related to passenger information across all mobility modes with respect to completeness and consideration in standards.
Public Deliverables
Currently available deliverables:
D11.3 Mapping of available Data Bases for regional lines (Final Release)
D11.4 Implementation Report of AI based demand analysis
D11.5 Implementation Report of Passenger congestion monitoring
D11.6 Report on developed functions for freight services using regional lines
D11.8 Requirement specification for services in regional lines (Final Release)
D11.9 Analysis and assessment of demonstration results
D2.1 Regional lines architecture
D2.2 Regional lines operational and functional requirements
D2.3 First release of KPI achievement
D2.5 Regional Migration Strategy
D2.6 Verification of KPI achievement
D6.3 Requirements and interface design for TMS-PIS
D6.4 Requirements and definitions on Data Bases for Regional Lines (Alpha Release)
D6.5 Specification of demand analysis algorithms
D6.6 Specification of Passenger congestion monitoring
D6.7 Technical specifications for using regional lines for freight services
D7.1 List of requirements for integrated demo sites
D7.2 Digital platform for CCS+ certification prototype
D7.3 List of facilities suitable for the physical demonstrators for integrated demos
D7.4 Implementation plan of activities
D7.5 List of & timeline for potential testing infrastructure incl. necessary requirements for preparation of Group 1 lines
D7.7 Test plans open standardized interfaces
D9.10 G2 regional lines of train-to-cloud communications
D9.11 Finalization of the SWOC LX Solution for Multimodality analysis Report